How do they lay railroad tracks?
- Member since
November 2007 - 2,989 posts
Posted by Railway Man on Thursday, January 7, 2010 7:32 PM
fredswain
...pavement is involved over them? In other words lets say we have some tracks, an old trolley line in this case that runs down a street. Let's say the street is all brick. I'm actually using Galveston as an example here. What is the track structure like underneath? Is it standard railroad tie construction which is then buried or is there another special method? I know trolley tracks are a bit different from freight lines so for the sake of comparison let's also pose the same question for freight lines running down the middle of streets. If they are standard ties, how you can monitor the condition of them or know when something is going bad?
Fred
The cheap, crummy, way is to built the track just like always, then lay down hot asphalt right over the track. If the idea is to keep the top of rail at the top of street, then the track has to be depressed into a slot in the finish grade of the street. Asphalt overlay is very common in industrial plants, ports, autoramps, lightly used branchlines running side streets, industrial spurs running in streets, and other locations where the vehicle traffic is relatively infrequent and the rail traffic is slow-speed.
The expensive, good way is to use precast concrete crossing panels lag-screwed to wood ties or affixed with several different systems to concrete ties. This is the preferred method in areas of high vehicular or rail traffic, or when someone else is paying for it, and is common in light-rail applications. Most light-rail construction running in city streets for long distances uses some type of direct-fixation track, however, which dispenses with the crosstie.
When streets were paved with brick, the track was laid in a slot excavated into the finish grade (just like with asphalt pavement), then a sand or tar bedding layer placed, then the pavers.
To repair track that is overlaid with asphalt or pavers, it's necessary to tear up the paving and make a big mess of things. In the days prior to the widespread adoption of pressure-treated ties, track and pavement maintenance employed large forces. With pressure-treated ties, even in such a badly drained application, one can get 35-50 years out of the track structure before it is so far gone that it has to be torn up and fixed.
RWM
- Reply
Since the first railroads were built almost 200 years ago, locomotive/train design and technology have advanced significantly, from steam-powered engines to super-fast maglev trains. Often overlooked, however, is the technology behind the thing that keeps these trains moving in the right direction: the tracks. Railroad track construction has undergone plenty of reform since the 19th Century, and this article summarizes how railroads are constructed. Before discussing construction, here are some commonly asked questions:
How wide are railroad tracks?
The US standard railroad gauge is 4 feet, 8.5 inches (Gauge means width between the two rails). The U.S. federal safety standards allow the standard gauge to vary from 4 ft 8 in (1,420 mm) to 4 ft 9 1⁄2 in (1,460 mm) for operation up to 60 mph (97 km/h). It’s commonly believed and was even written about in Popular Mechanics, that the gauge or width between tracks descended from Imperial Roman war chariots, which created ruts in roads that would destroy wagon wheels that weren’t the same width. Snopes does report this is partially false and that the gauge was inherited from England because English engineers designed the first US railroads and rails were largely imported from England until the Civil War.
Why do buses stop at railroad tracks?
This is required by law in the US. But only for school buses, not regular commuter buses. The law goes back to a 1938 fatal accident in Utah where the driver stopped at the railroad but did not visually confirm if a train was coming due to blizzard conditions. The fatalities from the accident tragically included the driver and 25 children. The full story of Utah’s 1938 Burgon’s Crossing school bus accident
Can a coin derail a train?
We added this one for fun, and of course, a coin can’t derail a train. A coin is not significant enough to cause a train to run off the rails and will have no effect. Based on mass and momentum and the principle of conservation of momentum comes into play and when two bodies with masses interact, the total momentum remains conserved.
In this case, the two bodies involved are the train and a coin. A train weighs thousands of pounds, and a coin is merely a few grams. That and moving at a high velocity, while the coin is stationary, the momentum of the train is much more than the coin. The coin is too light to affect the train’s momentum or direction.
Is putting a coin on the track illegal? Yes on two counts and it’s also dangerous. When an object is run over by a train, the momentum and weight will launch it as a dangerous projectile. Being on the tracks is considered trespassing and illegal and destroying a coin is illegal because it’s federal property.
Railroad Track Installation and Construction
The first step of laying down a railroad track is not very obvious, happening below the surface. One of the first things crews typically do is grade or install drainage systems to prevent the railway from waterlogging. These systems typically utilize pipes, carrier drains, and sometimes attenuation ponds to ensure that proper drainage occurs and subgrade deterioration and erosion are avoided.
The next step of this process involves laying down a layer of material for the rails to sit on in future steps. This process is called “ballasting”, and is divided into two steps: laying the bottom ballast and then the top ballast. The bottom ballast is made up of primarily coarse sand and is spread evenly and level to provide a slightly malleable but firm base for the railway crossties, also called sleepers, and the next layer.
Next, the railway sleepers are placed on top ballast and spaced appropriately. This process can be done manually or by the use of specialized machines, but in both cases, workers make sure that the central point of the sleepers and the rail track centerline are in alignment. Once this process is complete, railroad spikes and fasteners, also called chairs, are fixed to the sleepers of wood or bolted down with a chair bolt.
At this point, the rail is ready to be lowered onto the sleepers and fastened to the spikes. While a relatively straightforward process, there are many things engineers and workers have to keep in mind when laying down rails. One of these factors is correctly using rail joints when fastening multiple rail lengths together with a fishplate.
Most modern railways utilize continuous welded rail (CWR), sometimes known as ribbon railings. Rails are welded together using flash butt welding to make a single continuous rail that might be a few kilometers long. As there are just a few joints, this kind, of course, is quite powerful, provides a smooth ride, and requires less maintenance; trains may travel on it at greater rates and with less friction. In some cases, the cone can last for several weeks. The very first welded trail was used in Germany in 1924. And is becoming common on primary lines as in the 1950s.
An important factor is tension in CWR installations. Temperature can have dramatic effects on railroad tracks when the metal in the rail expands or contracts, having the potential to cause the track to buckle or separate. Because of this, knowing the Rail Neutral Temperature is essential.
After the rail has been laid, the top layer of ballast is typically applied. This ballast layer is made of small, coarse rocks of various shapes and materials. It is important that these rocks be irregularly shaped and not uniform, as they will pile up and hold stronger. This ballast will fill in all the gaps between and underneath the sleepers and rails, providing a strong base for the track as a whole. Typically, the second layer of top ballast will be applied after some trains pass to solidify the form.
Railroad environmental spill prevention
Aside from railway accidents, the next most common risk of hazardous spills comes from loading and unloading liquids. Facilities are required to have spill prevention measures or risk SPCC and EPA fines. The main form of spill prevention is railcar track pans, and SafeRack offers a complete range of railroad track pans and spill containment systems that are SPCC and EPA-compliant and safely capture hazardous spills from railcars. Our Polyethylene track pans and Metal railcar track pans are used globally to protect from accidental spills at railcar wash facilities, railroad tank car loading areas, and locomotive fueling stations.
Report an oil or chemical spill.
For emergencies and other sudden threats to public health, such as oil and/or chemical spills, radiation emergencies, and biological discharges, call the National Response Center at 1-800-424-8802. Learn more at epa.gov
SafeRack is the recognized industry leader in truck and railcar loading platform systems, maintenance work platforms, rolling platforms, and related safety and fall protection products. To learn more about our products and how we can help keep your workplace safe, contact a member of our team today.